1.首先是办公室装修施工中的各类的计划报表,主要是包括装修材料、人工费用、工程费用、装修成本核算、工程进度、办公室装修工地考勤等项目,这些项目报表数据是办公室装修的依据,是以后做出决策的根据。

1. is the first of all kinds of office decoration in the construction of the project report, mainly including decoration materials, labor costs, construction costs, renovation cost, project schedule, office decoration site attendance and other projects, these projects report data is the office decoration basis, is to make decisions according to the future.

2.办公室装修施工图和竣工图的管理,首先是需要甲方和监理费认可,同时,要对曲面图纸进行审核。

2. the management of the construction and completion drawings of the office, first of all, should be approved by Party A and supervision fee, at the same time, the surface drawings should be reviewed.

3.对办公室装修施工工程会议进行记录,这对装修施工工程签证、决算等起到非常重要的作用,也是影响施工进度的直接因素。

20160909092316818.jpg

3., record the meeting of office decoration construction engineering, which plays a very important role in the decoration and construction project visa and final accounts, and is also a direct factor affecting the progress of construction.

4.办公室装修工程签订单,对办公室装修工程项目的变更,明确相关单位的职责、权利,这也是影响到整个工程的结算。

4., office decoration works, sign the order, clarify the responsibilities and rights of the related units for the modification of office decoration projects, which is also affecting the settlement of the whole project.

5.办公室装修施工相关的通知单,包括需要发给相关单位和个人的通知书,比如:要求完成项目通知、要求拨款通知等等,这些要有书面的通知做为依据。

5., the relevant notice of office decoration and construction, including the notice to be issued to the relevant units and individuals, such as the completion of the project notice, the request for funding notice, etc., which need written notification as the basis.

6.办公室装修施工日志,要记录相关的装修施工的每一天的施工情况,对办公室施工日志进行每天总结,发现问题,解决问题等。

6. office decoration construction log, we should record the construction of every day in the related decoration works, summarize daily office log, find problems and solve problems.

7.办公室施工竣工资料的整理:包括办公室装修材料、相关设备说明书、装修材料合格证、对物品检查报告、报告家具保修卡等进行整理,此外要对各个施工阶段的检查、日志、停水、电以及可能发生的突发事件、影响施工进度的事件等进行填写和整理。

7. the office of construction completion data collection: collected including office decoration materials, decoration materials and related equipment specifications, report, certificate of goods inspection report furniture warranty card, in addition to the various stages of construction, water, electricity, check the log and unexpected events can occur, can affect the construction schedule of events etc. fill and finishing.

以上的精彩内容不知道您是否满意?想要查看更多的精彩内容请点击进入:济南办公写字楼装修http://www.chinazhuoyou.com我们会有更多精彩的内容与您一起分享!

The above wonderful content does not know if you are satisfied with it? If you want to see more wonderful contents, please click in: Ji'nan office building decoration http://www.chinazhuoyou.com, we will have more wonderful content to share with you.