工装装修一般都是在人流量比较多的地方,因此对装修的质量要求和施工时间是十分严格的!今天济南工装装修的小编就给大家总结一下工装装修设计的装修流程,希望对大家有所帮助!

Tool decoration is generally in places where people flow more, so the quality requirements for decoration and construction time are very strict! Today, the small edition of Jinan tooling decoration summarizes the decoration process of tooling decoration design, hoping to help everyone!

首先、工程装修前都会有一次装修设计对接交底;开工前,需要设计方与施工方及甲方三方一次现场施工对接设计图纸细节,设计方把图纸上需要注意哪些施工要点和施工方做一次详细讲解。在开工前需把施工难点弄清楚,避免后期开工后造成没必要的损失。

First of all, there will be a docking of decoration design before the project is renovated; before the start of construction, it is necessary for the designer and the construction party and Party A to have details of a site construction docking design drawings, and the designer will give a detailed explanation of what construction points and the construction party should pay attention to on the drawings. Before starting construction, it is necessary to clarify the construction difficulties so as to avoid unnecessary losses after starting construction later.

第二、工程交底后,施工队进场首要的做的是商铺的围挡工程;围挡施工工艺得按商场规定要求,材料一般都是用轻钢龙骨及石膏板封面,面盖广告喷绘。有些商场要求高,围挡外观喷绘还需用实木线条收边,整体外观得整齐美观。

Secondly, after the completion of the project, the first thing the construction team does is to enclose the shop; the enclosure construction technology must be in accordance with the requirements of the market, materials are generally light steel keel and gypsum board cover, cover advertising spray painting. Some shopping malls are demanding. Solid wood lines are used to draw the edges of the enclosure. The overall appearance is neat and beautiful.

第三、围挡完毕后就是正式的施工阶段,一般如有需打拆项目的会先开始,打拆工程需要主要的一点就是要分清墙体是否是承重墙,打拆工程一定要注意不能破坏承重墙及柱体。打拆工程完毕后一定要及时把淤泥清理运走,确保不能阻碍占用施工现场。

Third, after the completion of the enclosure is the formal construction stage, usually if there is a need to demolish the project will start first, demolition projects need to be the main point is to distinguish whether the wall is a load-bearing wall, demolition projects must pay attention to not destroy the load-bearing wall and columns. After the demolition project is completed, the sludge must be cleaned up and transported in time to ensure that the occupancy of the construction site can not be hindered.

济南工装装修

第四、泥水工先进场;泥工先把需要砌砖墙的地方施工好,地面需要水泥沙走平工程或地面铺砖工程也需接着完工。简外装饰在施工上都会建议先把毛坯的地面水泥沙走平或做好铺砖工程先,这样可在施工过程中减少灰尘对工人的伤害。当然,在铺砖或地面走平前先得把地面的水电工程做好。

Fourthly, the advanced field of hydraulics and cement works; first, the masonry workers should build the place where brick walls are needed, and then the cement sand leveling project or the ground brick laying project should be completed. In the construction of simple decoration, it is suggested that the ground cement sand of the blank should be leveled first or the bricklaying work should be done well first, so as to reduce the damage of dust to workers in the construction process. Of course, before laying bricks or leveling the ground, the hydropower works on the ground must be done well.

第五、水电隐蔽工程;天花电力工程及空调系统也需在木工封板前做好,在做天花隐蔽电工程时,一定要严格安装商场的电力要求来施工;商场的电工程材料要求都很严格,作为装修施工方千万不要偷工减料,后面造成的损失是非常严重的。

Fifth, concealed hydropower projects; smallpox electric power projects and air conditioning systems also need to be done well before woodworking closure. When doing smallpox concealed electrical projects, we must strictly install the electric power requirements of the shopping mall to construct; the electrical engineering materials requirements of the shopping mall are very strict, as a decoration construction party, do not jerry-work and reduce material, resulting in losses later. It's very serious.

以上就是今天济南工装装修的小编给大家整理的精彩内容了,也欢迎更多的小伙伴加入我们:http://www.chinazhuoyou.com

Above is the wonderful content of Jinan tooling decoration today, and more small partners are welcome to join us: http://www.chinazhuoyou.com.